Cubic Feet to Cubic Yard Conversion (+ How to Measure)
Cubic Feet to Cubic Yard Conversion
1 cubic yard equals 27 cubic feet. That number comes from cubing the length conversion: since 1 yard = 3 feet, a cube that is 1 yard on every side measures 3 ft × 3 ft × 3 ft = 27 cubic feet.
For background on the unit itself, see the cubic yard entry on Wikipedia.
The Conversion Formula
cubic yards = cubic feet ÷ 27

27 cu ft ÷ 27 = 1 cu yd
To go the other direction, multiply cubic yards by 27 to get cubic feet. This factor of 27 (not 3, as people sometimes guess) trips up a lot of DIY material calculations, because volume conversions scale by the cube of the linear conversion, not the linear factor itself.
Cubic Feet to Cubic Yards Chart
| Cubic Feet | Cubic Yards |
|---|---|
| 9 cu ft | 0.33 cu yd |
| 13.5 cu ft | 0.5 cu yd |
| 27 cu ft | 1 cu yd |
| 54 cu ft | 2 cu yd |
| 81 cu ft | 3 cu yd |
| 135 cu ft | 5 cu yd |
| 270 cu ft | 10 cu yd |
How to Calculate Cubic Feet
cubic feet = length × width × height (all in feet)
To find the volume of a rectangular space in cubic feet, multiply length by width by height, all measured in feet. A flowerbed that is 8 ft long, 4 ft wide, and 0.5 ft deep holds 8 × 4 × 0.5 = 16 cubic feet of soil. If any measurement is in inches, divide it by 12 first to convert to feet before multiplying.
How to Calculate Cubic Yards Directly
cubic yards = length × width × height (all in yards)
For larger jobs like concrete slabs or bulk mulch delivery, it’s often easier to measure directly in yards. Convert each foot measurement to yards first (divide by 3), then multiply length × width × height. A 30 ft × 15 ft × 0.33 ft (4-inch) concrete slab is 10 yd × 5 yd × 0.11 yd ≈ 5.5 cubic yards.
Why This Conversion Matters for Home Projects
Bulk landscaping materials – mulch, topsoil, gravel, sand, and ready-mix concrete – are almost always priced and delivered by the cubic yard, while most people naturally think in square feet (the footprint of a garden bed or driveway) and inches of depth. Getting from “I need to cover 200 square feet, 3 inches deep” to “how many cubic yards should I order” requires exactly this conversion, and ordering the wrong amount either wastes money on excess material or means a second delivery trip.

Estimating Material for a Project
| Step | What to Do |
|---|---|
| 1 | Measure the area to cover in square feet (length × width) |
| 2 | Decide the depth in feet (e.g. 3 inches = 0.25 ft) |
| 3 | Multiply area × depth to get cubic feet |
| 4 | Divide by 27 to get cubic yards |
For example, covering a 200 sq ft garden bed with 3 inches (0.25 ft) of mulch needs 200 × 0.25 = 50 cubic feet, which is 50 ÷ 27 ≈ 1.85 cubic yards – most suppliers would round that up to 2 yards to be safe.
Cubic Yards for Common Materials
| Material | Typical Coverage per Cubic Yard |
|---|---|
| Mulch (3 in deep) | ≈ 108 sq ft |
| Topsoil (4 in deep) | ≈ 81 sq ft |
| Gravel (2 in deep) | ≈ 162 sq ft |
| Concrete (4 in slab) | ≈ 81 sq ft |
These figures come from the same formula in reverse: dividing 27 cubic feet by the depth in feet gives the square footage one cubic yard will cover. Suppliers often print tables like this directly on delivery estimate forms, but it’s worth checking the assumed depth, since a supplier’s default depth doesn’t always match the depth a specific project needs.
Why Suppliers Round Up
Material suppliers almost always recommend rounding a calculated cubic yard figure up to the next half or whole yard, for a few practical reasons: real ground is never perfectly flat and level, some material is lost to compaction and settling after delivery, and running short mid-project usually costs more (a second delivery fee) than having a small amount left over. A common rule of thumb is to add 10% to a calculated volume before placing an order, on top of rounding to the nearest convenient delivery unit.
Quick Mental Shortcut
Round 27 to 25 or 30 for a fast in-your-head estimate, then adjust. Dividing cubic feet by 25 slightly overestimates the cubic yards needed (a safe direction for material orders), while dividing by 30 slightly underestimates – useful for a quick “does this delivery quote sound about right” gut check.

Related Conversions
See also how to calculate square feet for finding the area before adding depth, and square feet in an acre for larger land measurements.
Frequently Asked Questions
How many cubic feet are in a cubic yard?
27 cubic feet make up 1 cubic yard (3 ft × 3 ft × 3 ft).
Why is it 27 and not 3?
Because volume is three-dimensional, the linear conversion factor (3 feet per yard) gets cubed: 3 × 3 × 3 = 27, not just 3.
How many cubic yards of mulch do I need for 100 square feet?
At a typical 3-inch (0.25 ft) depth, 100 sq ft needs 25 cubic feet of mulch, or about 0.93 cubic yards – usually rounded up to 1 yard when ordering.
How many wheelbarrow loads are in a cubic yard?
A standard 6-cubic-foot wheelbarrow holds about 4.5 loads per cubic yard (27 ÷ 6); most people round this up to 5 loads to allow for partial fills.
How much does a cubic yard of concrete weigh?
A cubic yard of standard concrete weighs roughly 4,000 pounds (about 2 US tons), though the exact weight varies with the mix.
FAQ
How many cubic feet are in a cubic yard?
27 cubic feet make up 1 cubic yard (3 ft × 3 ft × 3 ft).
Why is it 27 and not 3?
Because volume is three-dimensional, the linear conversion factor (3 feet per yard) gets cubed: 3 × 3 × 3 = 27, not just 3.
How many cubic yards of mulch do I need for 100 square feet?
At a typical 3-inch (0.25 ft) depth, 100 sq ft needs 25 cubic feet of mulch, or about 0.93 cubic yards - usually rounded up to 1 yard when ordering.
How many wheelbarrow loads are in a cubic yard?
A standard 6-cubic-foot wheelbarrow holds about 4.5 loads per cubic yard (27 ÷ 6); most people round this up to 5 loads to allow for partial fills.
How much does a cubic yard of concrete weigh?
A cubic yard of standard concrete weighs roughly 4,000 pounds (about 2 US tons), though the exact weight varies with the mix.